Construction method of corrugated asphalt flashing
Base inspection shall be carried out to make sure that strength and flatness meet the requirements of construction specifications

Lay insulation boards on concrete roofs (depending on design and location)

Lay Dovoro corrugated flashing, with a longitudinal overlap of no less than 100mm and a transverse overlap of 1-2 waves

Place battens with spacing according to the requirements of roof tiles

Use an impact drill to drill holes and penetrate the batten, Dovoro corrugated flashing, and insulation board

Use Dovoro special nails to fix the batten, flashing, and insulation board onto the base concrete

Install cornice grates at the eaves to ensure ventilation and prevent birds from entering the space under the tiles

Lay and fix roof tiles (according to manufacturer's requirements)

Become a distributor
A professional and complete team provides comprehensive service support covering from scheme design, architectural design optimization, construction scheme guidance, cost estimation, warehousing and transportation, various accessories to pre-sales, during sales, and after-sales.












